From proposal to operation.
Named sites, distinct stages, and the evidence behind each.
138 projects shown of 138
| Project / Location | Stage | Operator or developer | Stated figure | Source as of |
|---|---|---|---|---|
| Applied Digital Delta Forge 1Boyce · United States | Under construction | Applied Digitaldeveloper | 430 MWPower · basis unspecifiedplanned · Applied DigitalStated 'An initial 430 MW of total utility power' across two buildings, enabling up to 300 MW of critical IT load; utility power, not IT load. The company says the campus can 'scale considerably in 2028 and beyond'.Source ↗ | |
| IREN Redbank Data CentreWagga Wagga · Australia | Proposed | IRENdeveloper | 900 MWPower · basis unspecifiedplanned · NSW Major Projects portal (SSD-155572991 project description)Stated 'a total power consumption of up to 900 megawatts (MW)'. An upper bound; the portal does not say whether this is IT or facility capacity. W.Media, citing the scoping report, calls it gross electrical capacity supporting about 600MW of IT load; that IT figure is not recorded.Source ↗ | |
| Meta Lebanon data center campus (Indiana)Lebanon · United States | Under construction | Metadeveloper | $10Bcapex usdplanned · MetaStated 'An investment of over $10 billion in data center infrastructure and the surrounding community'; a floor ('over'), including community investment; IEDC says over several phases.Source ↗ | |
| 5C Mount Carmel Township data center campusMount Carmel Township · United States | Proposed | No figure recorded | ||
| Duane Arnold restartIowa · United States | Financed | NextEra Energydeveloper | 615 MWgeneration mwplanned · US DOEStated Existing reactor capacity proposed for restored service, not current generation.Source ↗ | |
| Microsoft LVL-16 data center campus, Mecklenburg CountyMecklenburg County, Virginia · United States | Proposed | Microsoftdeveloper | No figure recorded | |
| Project Jupiter · Doña Ana CountyDoña Ana County, New Mexico · United States | Under construction | Oracledeveloper | 2.45 GWgeneration mwplanned · OracleStated Up to 2.45 GW of installed fuel-cell microgrid generation; not delivered power or data-center IT capacity.Source ↗ | |
| Singapore HBM packagingSingapore · Singapore | Under construction | Microndeveloper | $7Bcapex usdplanned · MicronStated Investment through the end of the decade and beyond, as stated at groundbreaking.Source ↗ | |
| NEXTDC M4 Technology CampusPort Melbourne · Australia | Delayed | NEXTDC · identity pendingdeveloper | 162 MWfacility capacity mwplanned · NEXTDCStated Full-campus planned capacity; power basis is not further specified.Source ↗ | |
| NEXTDC S4 Horsley ParkSydney · Australia | Under construction | NEXTDC · identity pendingdeveloper | 350 MWPower · basis unspecifiedplanned · NEXTDCStated Approximate total planned power stated in May 2026; 250 MW initial tranche is a subset. NEXTDC upgraded the total to 365 MW on Aug. 27, 2026.Source ↗ | |
| PORTS-Pike Technology CampusPiketon · United States | Announced | SB Energydeveloper | 8 GWit capacity mwplanned · NVIDIA and SB EnergyStated "8 IT-GW of AI factory capacity" resulting from at least 10 GW of new generation; OpenAI to be the customer.Source ↗ | |
| AWS New Carlisle data center campusNew Carlisle · United States | Under construction | Amazondeveloper | $11Bcapex usdplanned · Amazon Web Services (AWS)Stated 'AWS announced plans to invest an estimated $11 billion in Indiana' and 'will build new data centers in St. Joseph County'. The IEDC/Governor release says AWS 'plans to invest $11 billion to build a data center campus in north central Indiana'. This is an estimate, and the IEDC says it depends on long-term energy service agreements.Source ↗ | |
| Cape StationBeaver County, Utah · United States | Operational · partial | Fervo Energyoperator | 33 MWgeneration mwdelivered · Fervo EnergyStated First GeoBlock only; not the capacity of the full Cape Station development.Source ↗ | |
| SK hynix Yongin Y2Yongin · South Korea | Announced | SK hynixdeveloper | No figure recorded | |
| ZenithCambridge · United Kingdom | Operational · partial | University of Cambridgeoperator | No figure recorded | |
| Quaise Project ObsidianOregon · United States | Announced | Quaise Energydeveloper | No figure recorded | |
| AIB Data Centers CLT1Moore · United States | Announced | AIB Data Centersdeveloper | 50 MWit capacity mwplanned · AIB Data CentersStated Critical IT capacity contracted to Nebius, to be delivered in two data halls; not yet built.Source ↗ | |
| AWS Project Rise · WheatfieldWheatfield · United States | Under construction | Amazondeveloper | $7Bcapex usdreported · The Times of Northwest Indiana (press report)Stated '$7 billion Jasper County data center'; DatacenterDynamics repeats '$7 billion data center project'. Not attributed to an AWS statement in the opened text.Source ↗ | |
| SK hynix Yongin Y1Yongin · South Korea | Under construction | SK hynixdeveloper | $21.5Bcapex usdplanned · SK hynixStated Company-stated approximate USD equivalent of first-fab construction investment; equipment installation excluded.Source ↗ | |
| Soluna Project Dorothy 3ATexas · United States | Announced | Soluna Holdingsdeveloper | 50 MWit capacity mwplanned · Soluna HoldingsStated "A planned 50 MW critical IT data center"; Phase 1 of Dorothy 3.Source ↗ | |
| TELUS Kamloops AI expansionKamloops · Canada | Announced | TELUSdeveloper | 20 MWPower · basis unspecifiedplanned · TELUS (as reported by Daily Hive Urbanized)Stated 'The telecommunications company is expanding the Kamloops facility to 20 megawatts (MW) by the end of 2028.' Press paraphrase; The Globe and Mail reports the same plan. Target, not delivered capacity; basis unstated.Source ↗ | |
| Westbank 150 West Georgia AI data centreVancouver · Canada | Announced | Westbankdeveloper | No figure recorded | |
| Westbank M3 AI data centreVancouver · Canada | Announced | Westbankdeveloper | No figure recorded | |
| Cheyenne Prairie Generating Station expansionCheyenne · United States | Announced | Black Hills Corp.developer | 564 MWgeneration mwplanned · Black Hills Corp.Stated Nameplate capacity of new natural gas generation to be built and owned through a non-regulated affiliate.Source ↗ | |
| DA13 data center, Love Field (Dallas)Dallas · United States | Announced | $500Mcapex usdplanned · DA12 LLC (owner, TDLR registration)Stated Estimated cost of new construction on TDLR registration TABS2027005620; privately funded.Source ↗ | ||
| GlobalFoundries Malta U.S.–Japan fabsMalta · United States | Under construction | GlobalFoundriesoperator | $21Bcapex usdplanned · GlobalFoundriesStated "Up to $21 billion in funding" under the U.S.–Japan initiative for both fabs.Source ↗ | |
| Prologis Project Mila data center, TrentonTrenton · United States | Under construction | Prologisdeveloper | 250 MWPower · basis unspecifiedplanned · Prologis representatives (as reported by Journal-News)Stated 'the proposed 250-megawatt data center'; IT or facility basis not stated. Repeated by WYSO (July 9, 2026) and Journal-News (Nov. 12, 2026).Source ↗ | |
| TeraWulf Muskie Data CampusGrayson · United States | Announced | TeraWulfdeveloper | 1 GWfacility capacity mwplanned · TeraWulfStated 1 GW under the amended Kentucky Power agreement, which takes effect only on Kentucky PSC approval; the original 500 MW agreement remains in effect until then. Not delivered power or IT load.Source ↗ | |
| Fermi Project MatadorCarson County, Texas · United States | Under construction | Fermideveloper | 17 GWgeneration mwplanned · FermiStated "Expandable up to approximately 17 gigawatts" of generation; subject to customer agreements.Source ↗ | |
| Independence AI factoryIndependence · United States | Under construction | Nebiusdeveloper | 1.2 GWfacility capacity mwplanned · NebiusStated Potential full campus capacity, upper bound.Source ↗ | |
| Microsoft ATL80 data center campus, Floyd CountyRome · United States | Announced | Microsoftdeveloper | 422 MWPower · basis unspecifiedplanned · Floyd County DRI filing for MicrosoftStated Estimated peak connected electrical load, stated as 422 MW/444 MVA; IT capacity is not stated.Source ↗ | |
| Nebius second Mäntsälä data centerMäntsälä · Finland | Announced | Nebiusdeveloper | 70 MWPower · basis unspecifiedplanned · CaverionStated Caverion describes 'a new 70-megawatt building' served by a 70 MW substation; DCD and W.Media earlier reported up to 70 MW from a Nebius LinkedIn post. Basis (IT or facility) not stated.Source ↗ | |
| Nscale Monarch Compute CampusMason County, West Virginia · United States | Under construction | Nscaledeveloper | 1.37 GWit capacity mwplanned · NscaleStated Initial 2 GW of gross power capacity (1.37 GW of IT load power capacity) expected online by the first half of 2028.Source ↗ | |
| Nscale NarvikNarvik · Norway | Under construction | Nscaledeveloper Nordscale Operations ASoperator | 230 MWfacility capacity mwplanned · NscaleStated Campus nameplate plan; not delivered IT load.Source ↗ | |
| Samsung Onyang HBM advanced packaging fabAsan · South Korea | Under construction | Samsung Electronicsdeveloper | No figure recorded | |
| SpaceX Cochise County supercompute campusCochise County, Arizona · United States | Proposed | SpaceXdeveloper | 6 GWPower · basis unspecifiedplanned · Tombstone Resources L.L.C., per Cochise CountyStated Applicant's estimate at full build-out; basis (IT or facility) not stated.Source ↗ | |
| AWS Butler County data center campusButler County, Ohio · United States | Proposed | Amazondeveloper | No figure recorded | |
| Lydian Faraday battery storage (Utah)Utah County, Utah · United States | Operational | Lydian Energyoperator | 150 MWPower · basis unspecifieddelivered · Lydian EnergyStated 'The 150 MW/600 MWh project began operating on September 18, 2026.' Battery output rating.Source ↗ | |
| Meta Sturgeon County data centerSturgeon County, Alberta · Canada | Under construction | Metadeveloper | 1 GWPower · basis unspecifiedplanned · MetaStated Described as a new 1GW, AI-optimized data center; IT versus facility basis not stated.Source ↗ | |
| Nscale Loughton AI CampusLoughton · United Kingdom | Permitted | Nscaledeveloper | 50 MWPower · basis unspecifiedplanned · NscaleStated "50MW of AI capacity, scalable to 90MW"; IT or facility basis not stated.Source ↗ | |
| Bitzero Namsskogan data centerNamsskogan · Norway | Under construction | Bitzero Holdingsdeveloper | 110 MWPower · basis unspecifiedplanned · Bitzero HoldingsStated "Power readiness for 110MW this year"; IT or facility basis not stated. Ready-for-service capacity for tenants expected from Q4 2027 through Q1 2028.Source ↗ | |
| Calvert Cliffs nuclear uprateLusby · United States | Announced | Constellation Energyoperator | 190 MWgeneration mwplanned · Constellation EnergyStated Approximately 190 MW of additional generation.Source ↗ | |
| Google Palo data center campusPalo · United States | Announced | Alphabetdeveloper | No figure recorded | |
| Hyperion · Richland ParishRichland Parish, Louisiana · United States | Under construction | Metadeveloper | $875Mcontract value usdcommitted · MetaStated Contracts with Louisiana businesses; lower bound and a subset of project spending.Source ↗ | |
| SoftBank Sarawak AI infrastructure projectSarawak · Malaysia | Announced | SoftBankdeveloper | $1Bcapex usdplanned · SoftBank Group, Grab and PETROSStated "Proposed initial investment in the Sarawak project is US$1 billion" (US$800M SoftBank Group, US$100M Grab, US$100M PETROS); staged seed capital subject to milestones and closing conditions, not total project cost.Source ↗ | |
| SoftBank Tomakomai AI Data CenterTomakomai · Japan | Under construction | SoftBank Corp. · identity pendingdeveloper | 50 MWfacility capacity mwplanned · SoftBank Corp.Stated Maximum receiving capacity of the planned data hall building; investor briefing page 47.Source ↗ | |
| Telekom Industrial AI CloudMunich · Germany | Operational | Deutsche Telekomoperator | 10,000 GPUsgpu countdelivered · Deutsche TelekomStated Approximate number of NVIDIA Blackwell GPUs, including DGX B200 and RTX PRO systems.Source ↗ | |
| SpaceX Starbase gas plant and super-compute facilityStarbase · United States | Proposed | SpaceXdeveloper | $24Bcapex usdplanned · City of Starbase (notice of SpaceX's abatement application)Stated 'Estimated capital investment for initial phases of the project is approximately $24 billion, which may be constructed over multiple phases and include future expansions.'Source ↗ | |
| Data Center Valley, EkibastuzEkibastuz · Kazakhstan | Under construction | 300 MWPower · basis unspecifiedplanned · Government of Kazakhstan (Prime Minister's press service)Stated Step-down substation infrastructure with a capacity of 300 MW, expandable to 1 GW in the future; plus 15 km of transmission lines.Source ↗ | ||
| Equinix SG6Singapore · Singapore | Operational · partial | Equinixoperator | $290Mcapex usdreported · EquinixStated Approximately $290 million initial investment; not stated as the total cost.Source ↗ | |
| Microsoft Mount Pleasant expansion campusesMount Pleasant · United States | Permitted | Microsoftdeveloper | 5,800,000 sq ftarea sqftplanned · Village of Mount Pleasant (via Wisconsin Public Radio)Stated Durand Avenue campus only, amended plan; stated as over 5.8 million square feet, excluding substations. Village staff said it may change.Source ↗ | |
| NAVER GAK Sejong AI factory expansionSejong · South Korea | Announced | NAVER · identity pendingoperator | 200 MWPower · basis unspecifiedplanned · NVIDIAStated Planned AI factory scale by 2028; no delivered capacity is established. The source does not specify IT load or total facility power.Source ↗ | |
| TeraWulf Justified Data CampusHawesville · United States | Under construction | TeraWulfdeveloper | 401 MWit capacity mwplanned · TeraWulfStated Approximately 401 MW of critical IT load leased to Anthropic; the Nov. 2026 presentation targets delivery from Q4 2027 through Q2 2028. Not yet built.Source ↗ | |
| Amazon Somervell County data center campusSomervell County, Texas · United States | Announced | Amazondeveloper | $1Bcapex usdcommitted · Somervell County agreementStated Minimum capital investment by Dec. 31, 2028; a contract condition, not project cost.Source ↗ | |
| Bell AI Fabric SherwoodRural Municipality of Sherwood, Saskatchewan · Canada | Under construction | Bell Canadadeveloper | 300 MWPower · basis unspecifiedplanned · Bell CanadaStated Planned Sherwood campus capacity; IT versus facility power basis is not specified, and this is not current energized load.Source ↗ | |
| Cheyenne Fuel Cell projectCheyenne · United States | Announced | American Electric Powerdeveloper | ||
| Google Laramie County data centerCheyenne · United States | Announced | Alphabetdeveloper | $17Bcapex usdplanned · GoogleStated Long-term investment in the Laramie County data center; no period or breakdown stated. AEP's approximately $4 billion and Black Hills' $1.8 billion are separate company figures and are not added here.Source ↗ | |
| IREN Canal Flats AI expansionCanal Flats · Canada | Announced | IRENdeveloper | No figure recorded | |
| IREN Childress HorizonChildress · United States | Operational · partial | IRENdeveloper | 50 MWit capacity mwdelivered · IRENStated Horizon 1, the first of four 50 MW (IT) liquid-cooled deployments at Childress.Source ↗ | |
| Nscale Texas campusTexas · United States | Operational · partial | Nscaledeveloper | 240 MWPower · basis unspecifiedplanned · NscaleStated '~240MW hyperscale AI campus'; basis not stated. Potential to scale to 700 MW and a 1.2 GW Texas footprint are not recorded as figures.Source ↗ | |
| Project KilbyTexas · United States | Announced | 2.67 GWgeneration mwplanned · ChevronStated 'Approximately 2.67 gigawatts of capacity, built through a phased, modular approach that enables incremental expansion over time.'Source ↗ | ||
| Drax Power Station AI data centreNorth Yorkshire · United Kingdom | Announced | Radiantdeveloper | 100 MWPower · basis unspecifiedplanned · Drax GroupStated Phase 1 target 'up to 100MW' of compute capacity, operational from Q1 2028; IT/facility basis not stated.Source ↗ | |
| Google Elmina Business Park data center campusSelangor · Malaysia | Operational | $2Bcapex usdplanned · GoogleStated US$2 billion commitment in Malaysia including the first data center and a Google Cloud region; not specific to the campus.Source ↗ | ||
| Google Port Dickson data center campusPort Dickson · Malaysia | Announced | Alphabetdeveloper | No figure recorded | |
| Riot Corsicana campusCorsicana · United States | Announced | Riot Platformsdeveloper | 910 MWit capacity mwplanned · Riot PlatformsStated Critical IT capacity under the lease, delivered as powered pads in three phases.Source ↗ | |
| Riot Rockdale data centerRockdale · United States | Operational · partial | Riot Platformsdeveloper | 25 MWit capacity mwdelivered · Riot PlatformsStated First AMD capacity, commissioned and stabilized as of May 2026.Source ↗ | |
| COLOSSUS IIMemphis · United States | Operational · partial | SpaceXoperator | 210 MWPower · basis unspecifieddelivered · SpaceXStated First cluster: 'approximately 210 megawatts of compute power'; IT versus facility basis not stated.Source ↗ | |
| Microsoft St. Joseph County datacenter campusGranger · United States | Announced | Microsoftdeveloper | No figure recorded | |
| Google Pine Island data centerPine Island · United States | Announced | Alphabetdeveloper | No figure recorded | |
| Intel Fab 62Arizona · United States | Under construction | Inteldeveloper | No figure recorded | |
| SK hynix Cheongju M17Cheongju · South Korea | Announced | SK hynixdeveloper | No figure recorded | |
| AWS Homer City Energy Campus data centersPennsylvania · United States | Announced | Amazondeveloper | No figure recorded | |
| Digital Realty × Rönesans Ankara Temelli data center campusAnkara · Türkiye | Under construction | Digital Realtydeveloper Rönesans Infrastructuredeveloper | 22 MWit capacity mwplanned · Digital RealtyStated Designed to support more than 22 MW of carrier-neutral IT capacity; Rönesans also states more than 22 MW of IT capacity for the first phase.Source ↗ | |
| Google Monrovia data centerMonrovia · United States | Announced | Alphabetdeveloper | No figure recorded | |
| Google Muhos data centerMuhos · Finland | Delayed | Alphabetdeveloper | No figure recorded | |
| CoreWeave Copenhagen deploymentBallerup · Denmark | Operational · partial | CoreWeaveoperator | 22.5 MWit capacity mwplanned · CoreWeaveStated "The majority of its planned 22.5 megawatts (MW) of IT capacity" is online; live MW not stated.Source ↗ | |
| AirTrunk SYD3Sydney · Australia | Under construction | AirTrunkdeveloper | 400 MWPower · basis unspecifiedplanned · Bouygues ConstructionStated More than 400 MW planned campus capacity; lower bound, with IT versus facility power basis unspecified.Source ↗ | |
| Amkor Arizona advanced packaging and test campusPeoria · United States | Under construction | Amkor Technologydeveloper | $2Bcapex usdplanned · Amkor TechnologyStated "Approximately $2 billion" by full project completion; superseded by later totals.Source ↗ | |
| Nebius Lille-area AI factoryBéthune · France | Under construction | Nebiusdeveloper | 240 MWfacility capacity mwplanned · NebiusStated Capacity when fully deployed; not operational capacity.Source ↗ | |
| SWI Compute UK AI factory campusUnited Kingdom | Announced | 30 MWPower · basis unspecifiedplanned · SWI Compute (SWI Group)Stated Initial phase, expected to come online by the end of 2027; IT versus facility basis not stated.Source ↗ | ||
| 300 Holger Way data center conversion, San JoseSan Jose · United States | Permitted | 20 MWPower · basis unspecifiedplanned · City of San José (Planning, Building and Code Enforcement)Stated Special Use Permit to allow a data center use (20 megawatts) within an existing approximately 97,800-square-foot R&D building; basis not stated.Source ↗ | ||
| AWS data center plan at the former GWU Virginia campus, AshburnAshburn · United States | Cancelled | Amazondeveloper | 800,000 sq ftarea sqftplanned · Loudoun County Supervisor Juli BriskmanStated About 800,000 square feet of data center uses in four buildings, as described in the supervisor's release on Amazon's site plan application.Source ↗ | |
| Google Kajaani-Otanmäki data centerKajaani · Finland | Delayed | Alphabetdeveloper | No figure recorded | |
| HUMAIN–DataVolt OxagonOxagon · Saudi Arabia | Under construction | 100 MWfacility capacity mwplanned · NEOMStated Joint HUMAIN–DataVolt development; source does not identify IT versus facility power.Source ↗ | ||
| Intel Ohio One first fabNew Albany · United States | Delayed | Inteldeveloper | $28Bcapex usdplanned · IntelStated "More than $28 billion" for the construction of two new leading-edge chip factories at Ohio One; not specific to Mod 1.Source ↗ | |
| IREN Badajoz AI data center campusBadajoz · Spain | Permitted | IRENdeveloper | 300 MWPower · basis unspecifiedplanned · IRENStated "Approximately 300MW of capacity"; IT or facility basis not stated. Initial operations targeted for 2028.Source ↗ | |
| Sullivan County Xe-100 nuclear projectSullivan County, Indiana · United States | Proposed | American Electric Powerdeveloper X-energydeveloper | 960 MWgeneration mwplanned · American Electric PowerStated Initial project would include 12 Xe-100 units of 80 MW each, in groups of four, if it moves beyond the development phase. Amazon describes it as up to 960 MW.Source ↗ | |
| CDC Ashfords Road Data Centre, GregadooGregadoo · Australia | Proposed | CDC Data Centresdeveloper | 1.4 GWfacility capacity mwplanned · NSW Department of Planning, Housing and Infrastructure (project description)Stated "Total power consumption of up to 1.4 gigawatts."Source ↗ | |
| JASM Kumamoto Fab 2 (3nm)Kikuyo · Japan | Under construction | TSMCdeveloper | $10.8Bcapex usdplanned · METI (summary of JASM's certified plan)Stated "About US$10.8 billion scale" for the facilities and equipment for which support is sought.Source ↗ | |
| Micron Taichung AATT2 advanced assembly and testTaichung · Taiwan | Operational · partial | Micronoperator | No figure recorded | |
| Solaria data center park, UruguayCanelones · Uruguay | Announced | $5.7Bcapex usdplanned · Presidencia de la República (Uruguay)Stated Total investment: $5.5 billion for data centers plus $200 million for solar.Source ↗ | ||
| Digital Realty Kokomo data center campusKokomo · United States | Proposed | Digital Realtydeveloper | 1 GWit capacity mwplanned · Digital RealtyStated "Approximately 1 GW of additional IT capacity."Source ↗ | |
| TSMC additional Tainan 3nm fabTainan · Taiwan | Announced | TSMCdeveloper | No figure recorded | |
| Meta Mason County data centerMaysville · United States | Announced | Metadeveloper | 396 MWfacility capacity mwplanned · Mason County (community benefits agreement summary)Stated Initial phase only.Source ↗ | |
| Applied Materials EPIC CenterSunnyvale · United States | Operational | Applied Materialsoperator | $5Bcapex usdplanned · Applied MaterialsStated Expected spending over time, dependent on customer projects.Source ↗ | |
| Boise ID1 fabBoise · United States | Under construction | Microndeveloper | No figure recorded | |
| Micron Clay first fabClay · United States | Under construction | Microndeveloper | No figure recorded | |
| Micron Tongluo conversionTongluo · Taiwan | Under construction | Microndeveloper | 300,000 sq ftarea sqftdelivered · MicronStated Existing acquired cleanroom footprint, not new operational AI-memory output.Source ↗ | |
| Applied Digital Finland AI Factory campusFinland | Announced | Applied Digitaldeveloper | 1 GWPower · basis unspecifiedplanned · Applied DigitalStated Up to 1 GW of potential power capacity; campus described as capable of scaling to as much as 1 GW. Upper bound. The source does not specify IT load or total facility power.Source ↗ | |
| Applied Digital Polaris Forge 1Ellendale · United States | Operational · partial | Applied Digitaldeveloper | 250 MWit capacity mwdelivered · Applied DigitalStated Fully operational critical IT load after the second 75 MW phase of Building 2 reached Ready for Service; two buildings.Source ↗ | |
| CoreWeave Navi Mumbai campusNavi Mumbai · India | Announced | 240 MWPower · basis unspecifiedplanned · CoreWeaveStated Planned capacity across three 80 MW buildings; IT versus facility power is not specified; excludes the optional expansion of up to 240 MW.Source ↗ | ||
| Digital Realty KIX15Ibaraki · Japan | Under construction | Digital Realtydeveloper | 24 MWPower · basis unspecifiedplanned · Digital RealtyStated Planned 24 MW for KIX15; IT versus total facility power is not specified for this facility. The release separately gives portfolio-wide IT capacity, which is not used as the basis for KIX15.Source ↗ | |
| Project Star energy campusEncinal · United States | Announced | NextEra Energydeveloper | 6.47 GWgeneration mwplanned · NextEra Energy, Related Companies and Lewis Energy GroupStated Generation capacity of the energy campus; not the data center load.Source ↗ | |
| Related Digital Encinal data center campusEncinal · United States | Announced | Related Digitaldeveloper | 5 GWfacility capacity mwplanned · NextEra Energy, Related Companies and Lewis Energy GroupStated Data center campus capacity at full scale.Source ↗ | |
| Yotta Blackwell superclusterGreater Noida · India | Announced | Yotta Data Servicesdeveloper | 20,736 GPUsgpu countplanned · Yotta Data ServicesStated Planned GPU deployment; supporting Navi Mumbai capacity is part of the project scope.Source ↗ | |
| Lighthouse · Port WashingtonPort Washington · United States | Under construction | Vantage Data Centersdeveloper | ||
| Hermes 2Oak Ridge · United States | Under construction | Kairos Powerdeveloper | 50 MWgeneration mwplanned · Kairos PowerStated Planned Hermes 2 electricity output; upper bound.Source ↗ | |
| JERA–RHAELM Chiba AI infrastructure projectChiba · Japan | Announced | 400 MWPower · basis unspecifiedplanned · JERA, Dell Technologies and RHAELMStated Up to 400 MW of power capacity supporting the project; not operating. The source does not specify IT load or total facility power.Source ↗ | ||
| Microsoft Hebron datacenterHebron · United States | Under construction | Microsoftdeveloper | No figure recorded | |
| Microsoft Huntingwood data centreHuntingwood · Australia | Permitted | Microsoftdeveloper | 96 MWit capacity mwplanned · NSW Department of Planning, Housing and Infrastructure (assessment report)Stated Information technology load of the approved data centre.Source ↗ | |
| Microsoft New Albany datacenterNew Albany · United States | Under construction | Microsoftdeveloper | No figure recorded | |
| Terafab · Grimes CountyTexas · United States | Announced | SpaceXdeveloper | $16.8Bcapex usdplanned · Office of the Texas GovernorStated 'The first phase of the Terafab project represents a capital investment of more than $16.8 billion'; a lower bound for the first phase.Source ↗ | |
| DawnCambridge · United Kingdom | Operational | University of Cambridgeoperator | ||
| Isambard-AIBristol · United Kingdom | Operational | University of Bristoloperator | 5,448 GPUsgpu countdelivered · UK DSITStated Source counts NVIDIA GH200 Grace-Hopper superchips.Source ↗ | |
| Crane Clean Energy CenterLondonderry Township · United States | Under construction | Constellation Energydeveloper | 835 MWgeneration mwplanned · U.S. Department of EnergyStated Reactor output to be restored, subject to licensing.Source ↗ | |
| Project RedNevada · United States | Operational | Fervo Energyoperator | No figure recorded | |
| SK hynix Indiana HBMWest Lafayette · United States | Under construction | SK hynixdeveloper | ||
| L&T–Together AI Chennai clusterChennai · India | Announced | Larsen & Toubro · identity pendingdeveloper LTN Computedeveloper | 10,000 GPUsgpu countplanned · Larsen & ToubroStated GPU count for the contracted cluster, not for the entire Chennai campus.Source ↗ | |
| Nebius Lappeenranta AI factoryLappeenranta · Finland | Under construction | Nebiusdeveloper | 310 MWPower · basis unspecifiedplanned · NebiusStated Up to 310 MW of campus capacity as stated; IT versus total facility power is not specified.Source ↗ | |
| Meta Temple Data CenterTemple · United States | Operational · partial | Metadeveloper | ||
| Micron Hiroshima cleanroom expansionHigashihiroshima · Japan | Under construction | Microndeveloper | ||
| Microsoft Heath datacenterHeath · United States | Under construction | Microsoftdeveloper | No figure recorded | |
| Fairwater WisconsinMount Pleasant · United States | Operational | Microsoftoperator | 1,200,000 sq ftarea sqftreported · MicrosoftStated Combined area across three buildings, stated in September 2025.Source ↗ | |
| Reliance–Meta Jamnagar facilityJamnagar · India | Announced | Reliance Industries · identity pendingdeveloper | 168 MWPower · basis unspecifiedplanned · Reliance IndustriesStated Initial planned capacity with an option to scale; power basis is not specified.Source ↗ | |
| Stargate AbileneAbilene · United States | Operational · partial | Crusoedeveloper | 1.2 GWPower · basis unspecifiedplanned · CrusoeStated Full campus scale includes buildings still under construction. The source does not specify IT load or total facility power.Source ↗ | |
| Nscale HarjavaltaHarjavalta · Finland | Proposed | Nscaledeveloper | 150 MWPower · basis unspecifiedplanned · Town of HarjavaltaStated Upper end of an estimated total of 100-150 MW, from Nscale's May 27 presentation; IT or facility basis not stated.Source ↗ | |
| Mistral Paris South deploymentParis South · France | Announced | 10 MWPower · basis unspecifiedplanned · Digital RealtyStated Announced compute-cluster capacity; IT versus facility power basis is not specified.Source ↗ | ||
| SoftBank Osaka Sakai AI Data CenterSakai · Japan | Announced | SoftBank Corp. · identity pendingdeveloper | 140 MWfacility capacity mwplanned · SoftBank Corp.Stated Estimated receiving capacity needed for the targeted AI infrastructure; investor briefing page 47.Source ↗ | |
| TELUS Rimouski AI FactoryRimouski · Canada | Operational | TELUSoperator | No figure recorded | |
| Google Visakhapatnam AI hubVisakhapatnam · India | Under construction | Alphabetdeveloper | $15Bcapex usdplanned · GoogleStated Wider AI-hub program, including connectivity and supporting infrastructure.Source ↗ | |
| Nebius MäntsäläMäntsälä · Finland | Operational | Nebiusoperator | 75 MWPower · basis unspecifiedplanned · NebiusStated Nebius describes 'its first Finnish data center in Mäntsälä up to 75 MW, completed earlier this year'; ceiling of the completed expansion, basis (IT or facility) not stated, not utilization.Source ↗ | |
| Project RainierUnited States | Operational | Amazonoperator | No figure recorded | |
| Singapore NAND wafer fabSingapore · Singapore | Under construction | Microndeveloper | ||
| Syntys Q Data facilitiesQatar Free Zones · Qatar | Operational · partial | Syntysoperator | 5 MWit capacity mwdelivered · OoredooStated Live capacity in the acquired facilities; excludes 7.5 MW under development and the wider Syntys portfolio.Source ↗ | |
| N01 campus expansionVennesla · Norway | Financed | Bulk Infrastructuredeveloper | No figure recorded | |
| Stargate UAEAbu Dhabi · United Arab Emirates | Under construction | G42developer | 200 MWPower · basis unspecifiedplanned · G42Stated Planned first phase under construction; not the full 1 GW cluster or 5 GW campus. The source does not specify IT load or total facility power.Source ↗ | |
| CoreWeave Crawley deploymentCrawley · United Kingdom | Operational | CoreWeaveoperator | No figure recorded | |
| CoreWeave London DocklandsLondon · United Kingdom | Operational | CoreWeaveoperator | No figure recorded |