As stated by Crusoe ·
Full campus scale includes buildings still under construction. The source does not specify IT load or total facility power.
Crusoe sourceAbilene · Texas · United States
Crusoe reports two operating buildings at its Oracle campus, with six more still under construction. OpenAI separately confirms frontier-model training and serving at the Abilene site.
As stated by Crusoe ·
Full campus scale includes buildings still under construction. The source does not specify IT load or total facility power.
Crusoe sourceCrusoe’s June 9, 2026 release describes a planned 1.2 GW campus without specifying an IT-load or total-facility basis; the corrected label preserves partial operation and the full-campus scope.
Source published 09 Jun 2026 · Catalog recorded 25 Oct 2026 · Agent review
Crusoe reports two operating buildings at its Oracle campus, with six more still under construction. OpenAI separately confirms frontier-model training and serving at the Abilene site.
Source published 09 Jun 2026 · Catalog recorded 09 Oct 2026 · Agent review
Crusoe reports two operating buildings at its Oracle campus, with six more still under construction. OpenAI separately confirms frontier-model training and serving at the Abilene site.