Applied Digital is building Delta Forge 1, an AI Factory campus in Rapides Parish, Louisiana, designed for an initial 430 MW of total utility power and up to 300 MW of critical IT load in two 150 MW buildings. It broke ground on Jan. 22, 2026, and the 300 MW is leased under two leases of about 15 years to an unnamed U.S. investment-grade hyperscaler. On Nov. 23, 2026 Applied Digital said it had closed a $300 million delayed-draw bridge facility to fund continued development and construction of the campus.
The physical build-out of AI, tracked project by project.
Data centers, power, chips and the deals behind them, each with its stage, stated figures and sources.
- projects
- 138
- deals
- 93
- countries
- 22
Last catalog change
01 Where it is taking shape
Explore map ↗138 projects · 73 mapped · 65 not plotted
Equal Earth projection · Natural Earth · Locality reference points include GeoNames (CC BY 4.0). View changes framing; filters select projects.
Browse 138 projects 65 not plotted
Project directory
138- 300 Holger Way data center conversion, San JoseSan Jose, United States
- AirTrunk SYD3Sydney, Australia
- Applied Digital Polaris Forge 1Ellendale, United States
- Applied Materials EPIC CenterSunnyvale, United States
- Boise ID1 fabBoise, United States
- Calvert Cliffs nuclear uprateLusby, United States
- CDC Ashfords Road Data Centre, GregadooGregadoo, Australia
- Cheyenne Fuel Cell projectCheyenne, United States
- Cheyenne Prairie Generating Station expansionCheyenne, United States
- COLOSSUS IIMemphis, United States
- CoreWeave Crawley deploymentCrawley, United Kingdom
- CoreWeave London DocklandsLondon, United Kingdom
- CoreWeave Navi Mumbai campusNavi Mumbai, India
- Crane Clean Energy CenterLondonderry Township, United States
- DA13 data center, Love Field (Dallas)Dallas, United States
- DawnCambridge, United Kingdom
- Digital Realty × Rönesans Ankara Temelli data center campusAnkara, Türkiye
- Digital Realty KIX15Ibaraki, Japan
- Digital Realty Kokomo data center campusKokomo, United States
- Equinix SG6Singapore, Singapore
- Fairwater WisconsinMount Pleasant, United States
- Google Kajaani-Otanmäki data centerKajaani, Finland
- Google Laramie County data centerCheyenne, United States
- Google Monrovia data centerMonrovia, United States
- Google Visakhapatnam AI hubVisakhapatnam, India
- Hermes 2Oak Ridge, United States
- Hyperion · Richland ParishRichland Parish, Louisiana, United States
- Independence AI factoryIndependence, United States
- IREN Badajoz AI data center campusBadajoz, Spain
- IREN Childress HorizonChildress, United States
- IREN Redbank Data CentreWagga Wagga, Australia
- Isambard-AIBristol, United Kingdom
- JERA–RHAELM Chiba AI infrastructure projectChiba, Japan
- L&T–Together AI Chennai clusterChennai, India
- Lighthouse · Port WashingtonPort Washington, United States
- Meta Mason County data centerMaysville, United States
- Meta Temple Data CenterTemple, United States
- Micron Clay first fabClay, United States
- Micron Hiroshima cleanroom expansionHigashihiroshima, Japan
- Micron Taichung AATT2 advanced assembly and testTaichung, Taiwan
- Micron Tongluo conversionTongluo, Taiwan
- Microsoft Huntingwood data centreHuntingwood, Australia
- Microsoft Mount Pleasant expansion campusesMount Pleasant, United States
- N01 campus expansionVennesla, Norway
- NAVER GAK Sejong AI factory expansionSejong, South Korea
- Nebius Lappeenranta AI factoryLappeenranta, Finland
- Nebius MäntsäläMäntsälä, Finland
- NEXTDC M4 Technology CampusPort Melbourne, Australia
- NEXTDC S4 Horsley ParkSydney, Australia
- Nscale HarjavaltaHarjavalta, Finland
- Nscale NarvikNarvik, Norway
- Project Star energy campusEncinal, United States
- Related Digital Encinal data center campusEncinal, United States
- Reliance–Meta Jamnagar facilityJamnagar, India
- Singapore HBM packagingSingapore, Singapore
- Singapore NAND wafer fabSingapore, Singapore
- SK hynix Cheongju M17Cheongju, South Korea
- SK hynix Indiana HBMWest Lafayette, United States
- SK hynix Yongin Y1Yongin, South Korea
- SK hynix Yongin Y2Yongin, South Korea
- SoftBank Osaka Sakai AI Data CenterSakai, Japan
- SoftBank Tomakomai AI Data CenterTomakomai, Japan
- Stargate AbileneAbilene, United States
- Stargate UAEAbu Dhabi, United Arab Emirates
- Telekom Industrial AI CloudMunich, Germany
- TELUS Kamloops AI expansionKamloops, Canada
- TELUS Rimouski AI FactoryRimouski, Canada
- TeraWulf Muskie Data CampusGrayson, United States
- TSMC additional Tainan 3nm fabTainan, Taiwan
- Westbank 150 West Georgia AI data centreVancouver, Canada
- Westbank M3 AI data centreVancouver, Canada
- Yotta Blackwell superclusterGreater Noida, India
- ZenithCambridge, United Kingdom
Location not plotted
Country-only, undisclosed, or no recorded locality coordinates.
- 5C Mount Carmel Township data center campusMount Carmel Township, United States
- AIB Data Centers CLT1Moore, United States
- Amazon Somervell County data center campusSomervell County, Texas, United States
- Amkor Arizona advanced packaging and test campusPeoria, United States
- Applied Digital Delta Forge 1Boyce, United States
- Applied Digital Finland AI Factory campusFinland · country-level location
- AWS Butler County data center campusButler County, Ohio, United States
- AWS data center plan at the former GWU Virginia campus, AshburnAshburn, United States
- AWS Homer City Energy Campus data centersPennsylvania, United States
- AWS New Carlisle data center campusNew Carlisle, United States
- AWS Project Rise · WheatfieldWheatfield, United States
- Bell AI Fabric SherwoodRural Municipality of Sherwood, Saskatchewan, Canada
- Bitzero Namsskogan data centerNamsskogan, Norway
- Cape StationBeaver County, Utah, United States
- CoreWeave Copenhagen deploymentBallerup, Denmark
- Data Center Valley, EkibastuzEkibastuz, Kazakhstan
- Drax Power Station AI data centreNorth Yorkshire, United Kingdom
- Duane Arnold restartIowa, United States
- Fermi Project MatadorCarson County, Texas, United States
- GlobalFoundries Malta U.S.–Japan fabsMalta, United States
- Google Elmina Business Park data center campusSelangor, Malaysia
- Google Muhos data centerMuhos, Finland
- Google Palo data center campusPalo, United States
- Google Pine Island data centerPine Island, United States
- Google Port Dickson data center campusPort Dickson, Malaysia
- HUMAIN–DataVolt OxagonOxagon, Saudi Arabia
- Intel Fab 62Arizona, United States
- Intel Ohio One first fabNew Albany, United States
- IREN Canal Flats AI expansionCanal Flats, Canada
- JASM Kumamoto Fab 2 (3nm)Kikuyo, Japan
- Lydian Faraday battery storage (Utah)Utah County, Utah, United States
- Meta Lebanon data center campus (Indiana)Lebanon, United States
- Meta Sturgeon County data centerSturgeon County, Alberta, Canada
- Microsoft ATL80 data center campus, Floyd CountyRome, United States
- Microsoft Heath datacenterHeath, United States
- Microsoft Hebron datacenterHebron, United States
- Microsoft LVL-16 data center campus, Mecklenburg CountyMecklenburg County, Virginia, United States
- Microsoft New Albany datacenterNew Albany, United States
- Microsoft St. Joseph County datacenter campusGranger, United States
- Mistral Paris South deploymentParis South, France
- Nebius Lille-area AI factoryBéthune, France
- Nebius second Mäntsälä data centerMäntsälä, Finland
- Nscale Loughton AI CampusLoughton, United Kingdom
- Nscale Monarch Compute CampusMason County, West Virginia, United States
- Nscale Texas campusTexas, United States
- PORTS-Pike Technology CampusPiketon, United States
- Project Jupiter · Doña Ana CountyDoña Ana County, New Mexico, United States
- Project KilbyTexas, United States
- Project RainierUnited States · country-level location
- Project RedNevada, United States
- Prologis Project Mila data center, TrentonTrenton, United States
- Quaise Project ObsidianOregon, United States
- Riot Corsicana campusCorsicana, United States
- Riot Rockdale data centerRockdale, United States
- Samsung Onyang HBM advanced packaging fabAsan, South Korea
- SoftBank Sarawak AI infrastructure projectSarawak, Malaysia
- Solaria data center park, UruguayCanelones, Uruguay
- Soluna Project Dorothy 3ATexas, United States
- SpaceX Cochise County supercompute campusCochise County, Arizona, United States
- SpaceX Starbase gas plant and super-compute facilityStarbase, United States
- Sullivan County Xe-100 nuclear projectSullivan County, Indiana, United States
- SWI Compute UK AI factory campusUnited Kingdom · country-level location
- Syntys Q Data facilitiesQatar Free Zones, Qatar
- Terafab · Grimes CountyTexas, United States
- TeraWulf Justified Data CampusHawesville, United States
02Changed this week
All changesSource dates shown. Catalog entries mark admission, not a new announcement.
The NSW Major Projects portal lists Redbank as a State Significant Development at the assessment-requirements stage, describing five buildings and up to 900 MW of power consumption; Transgrid capacity is not yet allocated.
Micron installed the first process tool in a cleanroom at its Singapore HBM advanced packaging facility on Nov. 19, 2026, and still expects initial output in early calendar 2027, according to reports quoting the company.
Apollo and Goldman Sachs said they priced an upsized, oversubscribed issue of about $44 billion in senior and subordinated notes to fund GPUs and related equipment for SpaceX; the lease has not been reported as closed.
Oracle said it has secured all the funding needed to fulfill its OpenAI contract, including previously outlined vendor financing, without stating an amount.
Microsoft has applied for federal and state wetland permits to build the LVL-16 data center campus on three parcels totaling 316.7 acres in Mecklenburg County, Virginia. The application describes five one-story data center buildings, a campus amenities building and an onsite electrical substation next to Microsoft's existing LVL01-07 campus. The Army Corps of Engineers' Norfolk District is taking comments until Dec. 19, 2026.
03Project pipeline
Entries, not capacity
04Recent agreements
All deals| Announced | Agreement / Participants | Type / Status | Stated terms |
|---|---|---|---|
| Apollo × SpaceX · GPU finance lease Apollo Global Managementfinancier SpaceXpartner | financing debtAnnounced | $40Bcontract value usdplanned · SpaceXStated "Expects aggregate principal payments under the lease schedules ... to total approximately $40 billion". Lease financing, not capex.Source ↗ | |
| Oracle × OpenAI · additional Stargate capacity | cloud capacitySigned | 4.5 GWPower · basis unspecifiedplanned · OpenAIStated OpenAI states 4.5 GW of additional data center capacity under development, excluding Abilene, without an explicit IT-load or facility-power basis.Source ↗ | |
| Ohio Power × Google · Columbus advanced-conductor transmission upgrade American Electric Powerutility Alphabetpartner | utility serviceAnnounced | $10.8Mcontract value usdplanned · GoogleStated "$10.8 million incremental cost" of the advanced-conductor work, "funded completely by Google"; not the cost of the underlying utility line project. Subject to regulatory approval.Source ↗ | |
| Fervo × Longroad Energy · Cape Station 105 MW transmission service Fervo Energydeveloper Longroad Energypartner | utility serviceSigned | 105 MWPower · basis unspecifiedcommitted · Fervo EnergyStated Long-term firm transmission service on the Milford Gen Lead line; not generation capacity. Expected to begin in 2028, subject to final regulatory approvals. Fervo's 505 MW total includes the separate existing 400 MW arrangement and is not recorded here.Source ↗ | |
| Intel × Microsoft · Azure Xeon supply and EMIB packaging | chip supplySigned | No figure recorded | |
| NiSource × Amazon · northern Indiana data center service | utility serviceAmended | 2,400 MWPower · basis unspecifiedplanned · NiSourceStated Original capacity commitment increasing annually to 2,400 MW by the end of 2032; IT/facility basis not stated.Source ↗ | |
| Quaise × Google · Project Obsidian 50 MW geothermal PPA Quaise Energypower supplier Alphabetpartner | power supplySigned | 50 MWPower · basis unspecifiedcommitted · Quaise EnergyStated Power Google will purchase under the PPA, beginning as early as 2030; IT/facility or nameplate/net basis not stated.Source ↗ | |
| AIB Data Centers × Nebius · CLT1 capacity AIB Data Centerslandlord Nebiustenant | colocation leaseSigned | 50 MWit capacity mwcommitted · AIB Data CentersStated Critical IT capacity under the binding agreement.Source ↗ | |
| Applied Digital × Soluna · Dorothy 3A joint venture Applied Digitalpartner Soluna Holdingspartner | joint ventureSigned | No figure recorded | |
| Blackstone Digital Infrastructure Trust × Amazon · Indiana and Mississippi data center joint ventures Amazontenant | joint ventureSigned | $5Bcontract value usdcommitted · Blackstone Digital Infrastructure TrustStated 'aggregate gross value of $5.0 billion, reflecting an initial capitalization rate of 7.0%' for both campuses; subject to closing conditions. A transaction valuation, not capex.Source ↗ |